NPD Rangiora, Canterbury

This NPD construction began back in April 2019. We were contracted by Fuel Installations to do this service station. It just so happens that CMT Group did the entire project for the BP on the opposite side of the road a year or so prior.

The scope of works for this project is not as extensive as the service station opposite where MC Construction built the retail shop too, but it is extensive none the less. It involves demolition and removal of the previously existing buildings, and foundations. Supply and spread of imported hard-fill for entire forecourt and asphalt areas. Trenching for drainage and wiring, installation of piping for water and waste concrete structures. Pouring deadmen for tilt panels, all formwork, steel reinforcing and concrete construction to forecourt, footings for signs and canopy feet and civil work on kerbs and footpaths. Asphalt in areas required and finish off the site by landscaping with fencing, topsoil, mulch and plants as chosen to complete the project.

CMT Group locations

Copyright © CONPAVERS. 2017. All Rights Reserved - Site by Dan R & BDM