1/10

Huntly Train Station, Waikato

Total Tactilez were contracted indirectly to Kiwi Rail to drill and install 35,000 studs which was done over a two day period. These were installed into asphalt down the length and side of the Huntly train station platform. There was a small window of opportunity and this was all that was needed for our team to get in and get the job done from start to finish. With the aid of one of own purpose built machines using 12 drills, this was able to be accomplished in a short amount of time. Our teams are capable of installing huge quantities of studs and stair nosing around New Zealand. Call and ask us if we can help on your next project of Polyurethane or Stainless Steel Tactiles.

CMT Group locations

Copyright © CONPAVERS. 2017. All Rights Reserved - Site by Dan R & BDM