Contact
Contact

iReX Passenger Gangway

Client

iReX

Location

Picton

Completed

Only three weeks

  • Collaborative Teamwork:

Successfully navigated changes in plans post-construction, showcasing adaptability in project management. Responded to emergent needs by creating emergency exits, ensuring safety compliance.

  • Comprehensive Pathway Integration:

Seamlessly integrated containers ranging from 14m to 22m to create a continuous and functional pathway. Refurbished sections of the old gangway to enhance the overall quality and durability of the project.

  • Safety and Accessibility Focus:

Designed a barrier to shield customers from adverse weather conditions. Established a safe traffic access area through the gangway and stairs, prioritizing user safety.

 

  • Adaptability and Flexibility:

Successfully navigated changes in plans post-construction, showcasing adaptability in project management. Responded to emergent needs by creating emergency exits, ensuring safety compliance.

  • Resource Optimization:

Maximised the use of manpower to efficiently construct the walkway within the given timeframe.  Showcased resource optimization by repurposing shipping containers and refurbishing existing structures.

  • Turnkey Project Management:

Provided end-to-end project management, from concept to execution, ensuring a seamless and comprehensive solution for iReX.

  • Customer-Centric Approach:

Addressed client requirements by delivering a covered walkway that enhances the passenger experience. Prioritized client satisfaction by meeting project specifications and exceeding expectations.

  • Quality Craftsmanship:

Exhibited attention to detail and craftsmanship in piecing together various components to create a cohesive and durable structure. Ensured the final product met high-quality standards despite the challenging timeline.

chevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram