Contact
Contact

iReX Passenger Gangway

Client

iReX

Location

Picton

Completed

Only three weeks

The Interislander passenger gangway was one of our fastest large commercial projects to date. This was achieved by our team and our subcontractors due to their dedication and teamwork.  Thankyou to the team from iReX and Kiwirail for trusting us with this project. Our key learnings from this project are:

Collaborative Teamwork:

Successfully navigated changes in plans post-construction, showcasing adaptability in project management. Responded to emergent needs by creating emergency exits, ensuring safety compliance.

Comprehensive Pathway Integration:

Seamlessly integrated containers ranging from 14m to 22m to create a continuous and functional pathway. Refurbished sections of the old gangway to enhance the overall quality and durability of the project.

Safety and Accessibility Focus:

Designed a barrier to shield customers from adverse weather conditions. Established a safe traffic access area through the gangway and stairs, prioritizing user safety.

 

Adaptability and Flexibility:

Successfully navigated changes in plans post-construction, showcasing our project management adaptability. Responded to emergent needs by creating emergency exits, ensuring safety compliance.

Resource Optimization:

Maximised the use of manpower to efficiently construct the walkway within the given timeframe.  Showcased resource optimization by repurposing shipping containers and refurbishing existing structures.

 

Turnkey Project Management:

Provided end-to-end project management, from concept to execution, ensuring a seamless and comprehensive solution for iReX.

Customer-Centric Approach:

Addressed client requirements by delivering a covered walkway that enhances the passenger experience. Prioritized client satisfaction by meeting project specifications and exceeding expectations.

Quality Craftsmanship:

Exhibited attention to detail and craftsmanship in piecing together various components to create a cohesive and durable structure. Ensured the final product met high-quality standards despite the challenging timeline.

 

See what other projects we have been working on here.

chevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram