EV Charger Install: Why CMT Group are the right team for your project


Sustainable vehicles are the future. In recent years there has been a significant upward trend in the number of people swapping out their fuel-run vehicles for electric or hybrid vehicles. To keep up with the times, businesses such as Go Bus, BP and Z Energy have been adapting by installing EV (electric vehicle) chargers all over the country.

CMT Group capabilities mean we can work with EV suppliers Gahan Energy, ECL Group and others to install these chargers across multiple locations.

Capabilities

We understand the growing demand for EV infrastructure and are committed to delivering high-quality, on-time, and budget-friendly solutions for residential, commercial, and industrial clients.

Our Services:

  1. Site Assessments & Planning: Our experienced team will conduct a thorough evaluation of your property to determine the optimal location for your EV charger, considering factors like power availability, accessibility, and future needs.                              
  2. Mitigating risk in highly controlled spaces: One of the major challenges we tackled involved working in a highly controlled space underneath a forecourt. We implemented stringent safety protocols and collaborated closely with our clients to ensure the well-being of our team members and the successful completion of the project. Through meticulous planning and adherence to safety guidelines, we were able to navigate this complex environment effectively.
  3. Managing fire and spark risk during excavation: Excavating machinery inherently carries the risk of fire and sparks, especially in sensitive areas. Our team implemented comprehensive fire and spark risk management strategies to minimize any potential hazards. By employing state-of-the-art equipment and ensuring adherence to rigorous safety protocols, we successfully completed the excavation work without compromising safety or project timelines.
  4. Flexible and Efficient Team for Managing Customer Disruption: Customer disruption can be a significant challenge during construction projects. Our dedicated and adaptable team worked tirelessly to minimize any disruptions to our clients' operations. By employing efficient project management techniques, clear communication channels, and swift problem-solving skills, we were able to mitigate customer disruptions while ensuring the project progressed smoothly.
  5. Permitting & Approvals: We navigate the permitting process with local authorities to ensure your project complies with all electrical and building codes.
  6. Turnkey Installation: We seamlessly work with licensed electricians to handle the entire installation process, from trenching and conduit placement to equipment mounting and electrical connections. 
  7. Load Management: Our trusted electricians assess your existing electrical system and recommend load management solutions to ensure safe and efficient charging without overloading your grid connection.

 

Completed Projects:

Go Bus Installations:

The first of the EV installation undertakings was completed in Christchurch for the company Go Bus. The CMT Group crew installed 25 EV chargers at the Go Bus depot on Maces Road. Each charger has the capability to charge two buses at a time, entirely cutting off the need for fossil fuels in Go Buses' new fleet.

 

Petrol station Christchurch Locations:

Within the Christchurch area, the CMT team have completed the civil work for the installation of ten EV charging units, providing power to up to 20 vehicles at any one time. Seven chargers were installed at BP locations while the three others were installed at two Z locations. Almost all these locations were set up so that additional chargers can be added easily in future as demand increases.

The locations include:

-Edgeware BP, where one charging unit with two charging bays was installed.

-Fendalton BP, where one charging unit with two charging bays was installed.

-Marshlands BP, where one charging unit with two charging bays was installed.

-QE II BP, where one charging unit with two charging bays was installed.

-Ravenswood, where one charging unit with two charging bays was installed.

-Rolleston, where one charging unit with two charging bays was installed.

-Russley, where one charging unit with two charging bays was installed.

-Sawyers Arms Road Z, where one charging unit with two charging bays was installed.

-Shirly Z, Where two charging units with four charging bays were installed.

 

Petrol station wider Canterbury Locations:

Within the larger Canterbury area, the team were involved in installing four chargers. Providing power for up to eight vehicles at any one time. These were installed across three BP’s in different towns, two in Southern Canterbury and one North of Christchurch.

These locations include:

-Timaru BP, where one charging unit with two charging bays was installed.

-Ashburton BP, where two charging units with two charging bays were installed.

-Rangiora BP, where one charging unit with two charging bays was installed.

 

Petrol station Tasman/Marlborough Locations:

The top of the South also received the CMT Group EV treatment. Our Christchurch team consisting of seasoned civil operator Ian and father and son team Efren and Jeremy made the trip up. They installed a total of six chargers between Marlborough and Nelson.

These included:

-Blenheim BP, where one charging unit with two charging bays was installed.

-Picton Z, where two charging units with four charging bays were installed.

-Nelson BP, where three charging units with six charging bays were installed.