NPD Springcreek, Marlborough

Nelson Petroleum Distributors has provided CMT Group with another self-serve fuel station to construct for them. With this property on our home turf it was a great project to be awarded.

 

CMT Group had to tear down an iconic hotel before starting. Conpavers did all the earthwork, site work, civil, landscaping and concrete construction. MC Construction took care of all the boundary acoustic fences and boxing and formwork for concrete slabs.

 

This project became interesting very fast from the onset. Immediately there was a delay in having to contain the area for removal of asbestos prior to demolition commencing. Once that had been all taken care of then the main work could begin with removal of at least 500mm of material across the entire site. When the site was cleared then excavation and compaction of the new hardfill, excavation and backfilling for inground tanks, compaction of the base, meshwork, formwork and boxing for forecourt slab preparation. Preparation of base and compaction for footings of signs and canopy feet. The concrete pour for all required areas of the forecourt and kerbing for the roadside and asphalt in the remaining parts of the site.

As usual CMT Group achieved the completion date set, having started late due to unforeseen issues that always arise on sites with a happy outcome for our customer. Who is the most important person to our business.

CMT Group locations

Copyright © CONPAVERS. 2017. All Rights Reserved - Site by Dan R & BDM

NPD Springcreek