Watercraft, Blenheim

Conpavers was subcontracted to do all the groundwork for this project, from the excavation and disposal of the old foundations trenching for the new footings and drainage, supply and laying of all ducts, waterlines stormwater and drainage sumps. All sewer lines, oil and grit interceptors were supplied and installed as well as pre-treatment stormwater at the rear of the site due to the clean water entering the estuary. There were different types of drain channels laid around the building. Pavers were laid at the front of the building and landscaping done to complete the exterior of project.